Ram Jack Foundation Systems


RAM JACK® Helical Steel Piles

  • No rain delays
  • No holes to drill. Helicals are screwed into load bearing strata
  • Fast clean installation. No spoils.
  • No cure time. Grade beams can be installed immediately
  • Installed below active zone without casings. No crane required
  • Load carried on helix bearing plates
  • Slender shafts reduces heave potential due to skin friction
  • Each pile is tested for bearing capacity by monitoring the torque values
Drilled/cased Concrete Piers

  • Rain stops all work
  • Drill pier holes
  • Must clean up/remove spoils
  • Crane required to install casings
  • Must wait 28 days for concrete to cure before grade beams can be installed
  • Piers must be cased if water table is penetrated
  • Depends on skin friction for bearing
  • Large surface area susceptible to heave failure due to skin friction
  • No way to test during installation

Proud Members

  • Building Officials Association of Texas
  • Structural Engineers Association of Texas
  • Serving the Greater Houston Area
  • Texas Association of Builders
  • Foundation Repair Association
  • Foundation Performance Assn. of Texas
  • Deep Foundations Institute
  • Houston Home Builders Assoc.
  • Houston Apartment Association
  • Texas Apartment Association





CityStats

Comments are closed.