Ram Jack Foundation Systems
RAM JACK® Helical Steel Piles
- No rain delays
- No holes to drill. Helicals are screwed into load bearing strata
- Fast clean installation. No spoils.
- No cure time. Grade beams can be installed immediately
- Installed below active zone without casings. No crane required
- Load carried on helix bearing plates
- Slender shafts reduces heave potential due to skin friction
- Each pile is tested for bearing capacity by monitoring the torque values
Drilled/cased Concrete Piers
- Rain stops all work
- Drill pier holes
- Must clean up/remove spoils
- Crane required to install casings
- Must wait 28 days for concrete to cure before grade beams can be installed
- Piers must be cased if water table is penetrated
- Depends on skin friction for bearing
- Large surface area susceptible to heave failure due to skin friction
- No way to test during installation
Proud Members
- Building Officials Association of Texas
- Structural Engineers Association of Texas
- Serving the Greater Houston Area
- Texas Association of Builders
- Foundation Repair Association
- Foundation Performance Assn. of Texas
- Deep Foundations Institute
- Houston Home Builders Assoc.
- Houston Apartment Association
- Texas Apartment Association


